IR4.0 LEADERSHIP TRANSFORMATION

Total Productivity Management Coaching

Because Every Minute Counts

We Know Productivity

30+ years turning operations into high-performance systems.

End-to-End Solution

From people to processes to tech, we cover it all.

Result You Can Measure

Higher output, lower cost, sustained improvement.

Yen IR4.0
Why Implementing TPM?

Because Every Minute Counts

Reduce downtime, breakdown, and performance losses.

Engage operators in maintaining and improving productivity.

Lower cost, increase output, and stay competitive long-term.

Yen IR4.0
Mechanism To Implement TPM

Because Every Minute Counts

  • Introduction and kickoff
  • Conducting a 1-day TPM Awareness Training (9am – 5pm)
  • Setting Up TPM committee and auditing team 
  • Clarifying area of responsibility

Estimated Duration: 1 Day

Our consultant will conduct the TPM coaching with the following mechanism:

  • 1 coaching / week for first 3 weeks in every month
  • 1 audit on the 4th week in every month
  • 3 hours / session for each coaching & audit

Estimated Duration: 5 Months

We have more than 30 years of experience in manufacturing line

“I’m Loh Poh Ming, AGM of Asia Poly. What I like about Yen Premium Coach is the consultancy in guiding us in moving towards IR 4.0 is excellent. Their advice and proposal is very detail orientated.
I’d strongly recommend Yen Premium Coach to those who are looking for a professional IR4.0 consultant to guide through the process towards IR4.0.”

Ms Loh Poh Ming

Assistant General Manager, Asia Poly industrial Sdn Bhd

Choose Your Package

Package A
RM5,000/month + 8% SST

  • ≤ 50 staffs 
  • 6 Months of Guided, On-the-Ground Coaching for Real Result
  • Tailored TPM Strategy
  • Hands-On Implementation
  • Measurable, Lasting Result

Package B
RM6,000/month + 8% SST

  • ≤ 100 staffs 
  • 6 Months of Guided, On-the-Ground Coaching for Real Result
  • Tailored TPM Strategy
  • Hands-On Implementation
  • Measurable, Lasting Result

Because Every Minute Counts

Reducing Global Warming By 1.5°C Through ISO & IR4.0 

When The caterpillar calls the end of the world, the master calls a butterfly